当前位置 : 主页 > EN > Service Support > Technical Support >

UM103-A wireless intelligent multi-function grounding monito

time发布时间:2020-07-21 13:07
visit阅读:107 次
1. The wireless intelligent multi-function grounding monitoring host adopts the installation of Velcro:
First, cut the length of the Velcro (specification: width: 2.5cm) of 6cmx2 pieces (as shown in the figure),Paste on the host; then cut two pieces of the same Velcro,Press makes the two pieces close, and the installation position of the main engine is determined according to the site conditions (hoisting or flat mounting without affecting the operation);Flat mount - Velcro should be attached to the bottom of the host, and lifting - Velcro should be attached to the top or bottom of the host (depending on the paperback or lifting).
The Velcro should be tightly attached to the flat surface, and the mounting position should not have structural features such as steps or grooves. After installation, press it firmly.
Note:
1. The Velcro should be pasted in place at one time, if the second pasting will affect the effect, please choose the installation location carefully before pasting;
2. Before use, please make sure the surface of the object is clean and free of dust, especially oily surface;
3. After sticking firmly, press several times to make it fit tightly.
 
2. Wrist strap socket using Velcro installation:.
First cut the length of 4cmx2 pieces of Velcro (specification: 5.0cm wide) (as shown in the picture), and stick them on the socket; then cut two pieces of the same Velcro, press to close the two pieces,The socket installation position is usually hoisted under the premise of not affecting the operation; the Velcro should be tightly attached to the plane, and the mounting position should not have structural features such as steps or grooves. After installation, press it firmly.
下一篇:没有了